NEWS

Beach road construction: Motorists advised to use alternative roads such as Fertilizer Road, Tsui Bleoo Road, others

The Ministry of Roads and Highway has said contractors working on the Beach road in Accra have been directed to ensure that the dual carriage sections are opened to traffic.

The motoring public has been advised to use alternative roads such as Fertilizer Road, Tsui Bleoo Road, Spintex Road 1, Teshie Link, Adogon Highway and Burma Camp Roads 1 & 2 and follow directional signs.

“The Ghana Highway Authority has been working day and night to reconstruct the deck, applying modern technology of concrete production and use to ensure that the road is opened to traffic by Friday, 17 June 2022 at 6:00 am… Contractors working on the Beach road have been directed to ensure that the dual carriage sections are opened to traffic.

“The motoring public is advised to use alternative roads such as Fertilizer Road, Tsui Bleoo Road, Spintex Road 1, Teshie Link, Adogon Highway and Burma Camp Roads 1 & 2 and follow directional signs,” a statement by the Ministry said.

It added “In 2014, one span of the 2-span bridge was replaced with a steel deck. Presently, the steel deck has failed and defects have occurred in the remaining reinforced concrete slab.

“The defects on the steel deck have affected the steel beams and welds. In order to save life and property, it was imperative to close that section of the road for emergency repairs.”

Source: Laud Nartey|3news.com|Ghana

Related Posts